Magnet ID :     Calibration
Directory : S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+By_center\Final Results\Stretched Wire
   
Date : 06-29-2018
Time : 11:12:25 - 12:16:51
Operator : VV
   
Project : LCLS-II
Device Type : Phase Shifter
Run Number : 1
Data Type :
Run Comment : 126 Gauss*cm magnet, +By, center pos
   
gap I1Y I2Y I1X I2X
-
109.9 0.3 (5)
22.3 0.1 (5)
3.4 0.5 (4)
1.0 0.3 (5)

integral gap -02.00;+00.00 -01.00;+00.00 +00.00;+00.00 +01.00;+00.00 +02.00;+00.00
I1Y -
105.0 5.9 (3)
108.8 0.9 (3)
105.3 6.1 (3)
108.8 0.9 (3)
108.5 0.7 (3)
I2Y -
21.9 0.3 (3)
22.0 0.2 (2)
21.8 0.2 (3)
22.2 0.1 (2)
21.9 0.2 (3)
I1X -
4.1 0.4 (3)
4.0 0.9 (3)
4.3 0.6 (3)
3.5 0.7 (3)
3.8 0.9 (3)
I2X -
1.0 0.2 (3)
0.8 0.1 (3)
1.0 0.3 (3)
0.8 0.0 (3)
0.9 0.3 (3)

integral gap +00.00;-02.00 +00.00;-01.00 +00.00;+00.00 +00.00;+01.00 +00.00;+02.00
I1Y -
105.9 9.5 (2)
109.3 0.1 (2)
99.1 0.0 (1)
109.5 0.4 (3)
104.2 7.2 (2)
I2Y -
21.5 1.6 (3)
22.2 0.1 (3)
22.3 0.2 (3)
22.2 0.2 (2)
22.2 0.2 (3)
I1X -
3.5 0.2 (3)
0.8 0.4 (3)
2.4 1.7 (3)
1.7 1.2 (3)
1.5 1.5 (3)
I2X -
1.1 0.0 (2)
0.3 0.1 (3)
0.8 0.5 (3)
0.4 0.1 (3)
0.6 0.4 (3)

   
Magnet ID :     Calibration
Directory : S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+By_center\Final Results\Stretched Wire